An Imperfect Integrated Production with Advertisement Cost Due to PMC under Fuzzy Systems
DOI:
https://doi.org/10.61841/q3rt7m26Keywords:
Data Mining, nowledge Discovery, Feature subset, priority instance picking, Rework, EPQ, Inspection cost,, Advertising cost,, Penalty Maintenance cost,, Pentagonal fuzzy numberAbstract
The development of imperfect production setup in fuzzy system is proposed in the paper. The demand function is treated as exponential together with inventory. The outcome of the paper mainly concentrates on reducing the total price of the production cycle as the number of cycles increases, this result is compared with the fuzzy environment by using the pentagonal fuzzy number and the graded mean difference method is adopted for defuzzification of the result. Eventually, numerical illustrations are provided for comparing the total cost of the model introduced and the logical analysis are carried out for analyzing the impact of parameter variation on the decision variables.
Downloads
References
1. Taleizadeh, A. A., Mohammadi, B., Cárdenas-Barrón, L. E., & Samimi, H. (2013). An EOQ model for perishable product with special sale and shortage. International Journal of Production Economics, 145(1), 318-338
2. Akhavan Niaki, S.T., Taleizadeh, A. and Najafi, A.A., Economic Production Quantity Model with Scrapped Items and Limited Production Capacity. scientiairanica, 17(1), pp.0-0
3. Taleizadeh AA, Jalali-Naini SG, Wee HM, Kuo TC. An imperfect multi-product production system with rework. Scientia Iranica. 2013 Jun 1;20(3):811-23
4. Taleizadeh AA, Mohammadi B, Cárdenas-Barrón LE, Samimi H. An EOQ model for perishable product with special sale and shortage. International Journal of Production Economics. 2013 Sep 1;145(1):318-38.
5. Taleizadeh AA, Noori-daryan M. Pricing, inventory and production policies in a supply chain of pharmacological products with rework process: a game theoretic approach. Operational Research. 2016 Apr 1;16(1):89-115.
6. Taleizadeh AA, Sadjadi SJ, Niaki ST. Multiproduct EPQ model with single machine, backordering and immediate rework process. European Journal of Industrial Engineering. 2011 Jan 1;5(4):388-411.
7. A.A. Taleizadeha, Hui - Ming Wee, Seyed Jafar Sadjadi (2010), ' Multi - product production quantity model with repair failure and partial backordering ', Computers and industrial engineering, Vol - 59, pp 45
- 54.
8. Taleizadeh, Ata Allah, Hui-Ming Wee, and Seyed Jafar Sadjadi. "Multi-product production quantity model with repair failure and partial backordering." Computers & Industrial Engineering 59, no. 1 (2010): 45-54.
9. Sahoo, A. and Dash, J.K., 2016. A novel method for optimal solution of fuzzy chance constraint single-period inventory model. Advances in Fuzzy Systems, 2016.
10. Mahapatra, G. S., Sudip Adak, and K. Kaladhar. "A fuzzy inventory model with three parameter Weibull deterioration with reliant holding cost and demand incorporating reliability." Journal of Intelligent & Fuzzy Systems Preprint (2019): 1-14.
11. Jamal, A. M. M., Bhaba R. Sarker, and Sanjay Mondal. "Optimal manufacturing batch size with rework process at a single-stage production system." Computers & industrial engineering 47, no. 1 (2004): 77-89.
12. Krishnamoorthi, C., and S. Panayappan. "An EPQ model with imperfect production systems with rework of regular production and sales return." (2012).
13. Cárdenas-Barrón LE, Treviño-Garza G, Taleizadeh AA, Vasant P. Determining replenishment lot size and shipment policy for an EPQ inventory model with delivery and rework. Mathematical Problems in Engineering. 2015.
14. Voskoglou, M. (2015). Use of the triangular fuzzy numbers for student assessment. arXiv preprint arXiv:1507.03257.
15. Pakhira, Rituparna, Uttam Ghosh, and Susmita Sarkar. "Study of Memory Effect in a Fuzzy EOQ Model with No Shortage." (2019).
16. Priyan, S., and R. Uthayakumar. "An integrated production-distribution inventory system for deteriorating products involving fuzzy deterioration and variable setup cost." Journal of Industrial and Production Engineering 31.8 (2014): 491-503.
17. Priyan S, Palanivel M, Uthayakumar R. Mathematical modeling for EOQ inventory system with advance payment and fuzzy parameters. International Journal of Supply and Operations Management. 2014 Oct 1;1(3):260.
18. Sugapriya C, Jeyaraman K. Determining a common production cycle time for an EPQ model for non-instantaneous deteriorating items allowing price discount using permissible delay in payments. ARPN Journal of Engineering and Applied Sciences. 2008 Apr;3(2):26-30.
19. Sugapriya, C., 2017. EPQ Model for an Item Undergoes Non-Instantaneous Deterioration Receives Price Discount Permits Delay in Payments. International Journal of Mathematics and Computer Applications Research (IJMCAR), 7(3), pp.1-6.
20. Sugapriya C, Jeyaraman K. An EPQ model for non-instantaneous deteriorating item in which holding cost varies with time. Electronic journal of applied statistical analysis. 2008 Dec 20;1(1):16-23.
21. C. Sugapriya, K.Jeyaraman (2011), 'An EPQ model Permitting two levels of trade credit period ', International Journal of Mathematical Archive, Vol - 2, Issue - 12, pp 2695 – 2701.
22. Sekar, T., and R. Uthayakumar. "A production inventory model for single vendor single buyer integrated demand with multiple production setups and rework." Uncertain Supply Chain Management 6, no. 1 (2018): 75-90.
23. Uthayakumar, R., & Tharani, S. (2017). An economic production model for deteriorating items and time dependent demand with rework and multiple production setups. Journal of Industrial Engineering International, 13(4), 499-512.
24. Zhou, W. Q., and Long Chen. "Research on the inventory control of the remanufacturing reverse logistics based on the quantitative examination." Scientia Iranica. Transaction E, Industrial Engineering 24.2 (2017): 741.
25. Leopoldo Eduardo Cardenas - Barron, Gerardo Trevino - Garza, Ata Allah Taleizadeh and Pandian Vasanth (2015), 'Determining Replenishment Lot Size and Shipment Policy for an EPQ Inventory Model with Delivery and Rework ', Mathematical problems in Engineering, Vol - 2015, pp 1 - 8.
26. Misagh Rahbari, Bahman Naderi and Mohammad Mohammadi (2018), ' Modeling and solving the inventory Routing Problem with CO2 Emissions Consideration and Transshipment option ', Environmental processes, Vol - 5, Issue - 3, pp 649 – 665.
27. C. Sugapriya (2017), ' EPQ Model for Non-instantaneous deterioration receives price discount permits delay in payments ', International Journal of Mathematics and Computer Applications Research (IJMCAR), Vol - 7, Issue - 3, pp 1 – 6.
28. C. Sugapriya, & K.Jeyaraman (2008), 'An EPQ Model for Non-instantaneous deteriorating item in which holding cost varies with time ', Electronic Journal of Applied Statistical Analysis, Vol - 1, pp 16 – 23.
29. C. Sugapriya, & K.Jeyaraman (2011), 'An EPQ model Permitting two levels of trade credit period ', International Journal of Mathematical Archive, Vol - 2, Issue - 12, pp 2695 – 2701.
30. Uthayakumar.R & S.Tharani (2017), ' An economic production model for deteriorating items and time dependent demand with rework and multiple production setups ' , Journal of Industrial Engineering International, Vol -13(4), pp 499 – 512.
31. Vinod kumar Mishra, Lal Sahab Singh and Rakesh Kumar (2013), ' An Inventory model for deteriorating items with time - dependent demand and time - varying holding cost under partial backlogging ', Journal of Industrial Engineering, Vol - 9, pp – 4
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
You are free to:
- Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
- Adapt — remix, transform, and build upon the material for any purpose, even commercially.
- The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
- Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation .
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.
