Anwar, A., Damur Rochman, D., & Rahmana, A. (2020). Model Hybrid Flowshop 2 Stage with Johnson’s Rule Dispacthing to Minimize Makespan. International Journal of Psychosocial Rehabilitation, 24(2), 7734-7740. https://doi.org/10.61841/zwmdez33