[1]
Yoesgiantoro, D. 2020. The Decision of the Most Feasible Power Plant in Underdeveloped, Remote and Outermost (3T) Region by Decision Matrix Analysis: Case Study of Pasi Island. International Journal of Psychosocial Rehabilitation. 24, 6 (Jun. 2020), 1913–1928. DOI:https://doi.org/10.61841/6vkacb03.